Tutorial

Soil Compaction Methods

Before funding could be secured for an excavation and controlled compacted fill project, three methods of the task needed to be explained with visuals. The point was to show what was involved in terms of resources and time needed.

Modeled in 3DS Max and rendered with Vray. The sequence was composed in After Effects.