Back to project archive
Construction visualization / planning explanation
Soil Compaction Methods
A visual comparison of three soil-compaction methods and the resources, sequence, and time each required.
Case study
Showing what each construction method required.
Before funding the project, stakeholders needed to understand three methods for excavation and controlled compacted fill. Each option involved different equipment, material movement, staging, and time.
I modeled and rendered the sequences in 3DS Max and V-Ray, then composed them in After Effects. By showing the operational differences, the visuals gave the funding discussion a concrete basis.